Two Level Layout

These are photos of the Train Depot November Layout. Click on the images above to get a closer look.
It features two levels, two crossovers, a total of three loops and there is an incline to get from one level to the other.

Support pillars are shown in red, with wider ones indicating taller pillars. Yellow means a gantry type support for straddling the lower track. Two girder bridges are needed, also shown in yellow, that I built with Technic beams.


1Basic Oval
2Extended Oval
2Crossovers
7x 4515
3x 4520
2x 4531